SRT is at its capacity 6am-10am and 3pm-8pm. Replacing it would mean replacing everything just like it’s a new line. Vehicles are no longer manufactured and the current infrastructure is literally crumbling. Kennedy&STC can handle 6car SRT train set, Midland&McCowan has the platform for it beyond the gate, but would need a retrofit, Lawrence&Ellesmere would need a bigger retrofit to accommodate 6car sets. Not to mention elevators at Lawrence,Ellesmere,Midland,McCowan.
Plus John Tory said climbing 3 levels of stairs is too much for residents to endure to transfer from line2-line3…yet he was okay with 2 levels of stairs and a 300m walk to an outdoor Smart Track station…..
I will say, Lawrence East may be missed. The new stop at is a bit far east at McCowan, and the Smart Track stop was cancelled. I personally believe the SRT right of way should be a private BRT up to ellesmere.