darth_freeman
Active Member
That itself is a fallacy as for the same cost of the subway, we could built the Scarb LRT, Sheppard LRT and Eglinton East LRT.
Well that's just a silly argument, as I could just as easily say, instead of building the DRL long east + west ($15-20B?), we could build every single imaginable LRT line in the entire GTA.
If we look at it like this, we'd never build another subway ever again.