D
drum118
Guest
I said some time ago that the BD should be built up to Sheppard & McCowan where a rough in station is built below the McCowan line for the Sheppard line with stations at current cross roads and STC.
A rider would save 10 minutes or more by using the BD-MC line compare to using the SRT. There would be no need to change to or from Buses/SRT at STC and SRT/SUB at Kennedy. Also, they will not have to stand on platforms where they have to deal with the weather like they do now on the SRT.
Building the Sheppard line to STC was a poor design and it does not address the needs for true cross-town lines in the northern parts of Toronto. In time, the Sheppard line can be built further east of McCowan. The missing link between Yonge and Downsview station needs to be build before the Sheppard line is, to take some of the load off the Yonge line since the U/S line has low ridership now where every other train is short turn at St Clair West station during the day.
Eglinton line would be the midtown line.
Kennedy station will have to be rebuilt for the extension.
I know I will be doing a report to go before TTC when the study for the SRT is completed and it will not be looking at just subways as it will include LRT's also and BRT's (ugh, but some routes is all it can support).
Dave
A rider would save 10 minutes or more by using the BD-MC line compare to using the SRT. There would be no need to change to or from Buses/SRT at STC and SRT/SUB at Kennedy. Also, they will not have to stand on platforms where they have to deal with the weather like they do now on the SRT.
Building the Sheppard line to STC was a poor design and it does not address the needs for true cross-town lines in the northern parts of Toronto. In time, the Sheppard line can be built further east of McCowan. The missing link between Yonge and Downsview station needs to be build before the Sheppard line is, to take some of the load off the Yonge line since the U/S line has low ridership now where every other train is short turn at St Clair West station during the day.
Eglinton line would be the midtown line.
Kennedy station will have to be rebuilt for the extension.
I know I will be doing a report to go before TTC when the study for the SRT is completed and it will not be looking at just subways as it will include LRT's also and BRT's (ugh, but some routes is all it can support).
Dave