EAST DON TRAIL PHASE 1 UPDATE
February 22, 2022
Toronto and Region Conservation Authority (TRCA) has just submitted the 90% detailed design for the proposed tunnel and pedestrian bridge through the Metrolinx rail corridor to AECOM (Metrolinx third party reviewer) for review. In addition, TRCA is preparing to issue pre-qualification for contractors, for bidding on the upcoming tender.
The tender is tentatively scheduled to be issued in April 2022, with construction of the pedestrian bridge to commence in June/July, and tunnel construction in fall of this year, pending receipt of all permits and approvals.