News   Apr 17, 2026
 820     0 
News   Apr 17, 2026
 1.9K     6 
News   Apr 17, 2026
 770     0 

Search results

  1. G

    Toronto Bloor-Lansdowne GO Station | 6.77m | 1s | Metrolinx | Brown + Storey

    Between SNCF Voyageurs, CDPQ, AtkinsRealis, and Keolis, the number of Anglos involved in the project should be sufficiently minimized to ensure some level of construction activity occurs.
  2. G

    Sheppard Line 4 Subway Extension (Proposed)

    Yes it went very well from a project finance and timeline perspective. Probably the most successful transit procurement in recent Canadian history. The public did not like the inconvenience of roads being torn up for months.
  3. G

    Sheppard Line 4 Subway Extension (Proposed)

    Why? Walking from Central Downsview to Sheppard West is not a small distance, forget South Downsview. I will remind you that Downsview is comparable in land area to the Line 1 catchment south of College. These two stations could be built on a per station budget similar to original Line 4...
  4. G

    Sheppard Line 4 Subway Extension (Proposed)

    Not doing this would be incredibly shortsighted. The city has the potential to cheaply cut and cover and tunnel though the vacant Downsview lands and save billions of dollars. I'd argue just build the tunnels and station caverns preemptively now, then finish construction whenever we do...
  5. G

    Toronto East Harbour GO & Ontario Line Station | 14.35m | 1s | Metrolinx | HDR

    The wide rail embankment cutting through neighbourhoods is really reminiscent of London.
  6. G

    GO Transit: Construction Projects (Metrolinx, various)

    Good! 2036 is quite far but EMUs are the way to build world class regional rail, not electric locos.
  7. G

    Billy Bishop Airport Expansion?

    The whole point of jets at Billy bishop is to expand range to destinations in the southern US, West Coast, Mexico, and Caribbean. Alto doesn’t change much on that front.
  8. G

    Ontario Line Extension West of Ontario Place (Speculation)

    If Jane was chosen: I'd rather see a routing through Roncesvalles to Dundas West, then up the rail corridor with 1-2 stations in the junction before turning onto Jane
  9. G

    Toronto U of T: Academic Wood Tower | 77m | 14s | U of T | Patkau

    Moving incredibly slow for a CLT structure. Wonder if they are having fabrication issues or something? Supplier changed midway? Brock commons at UBC (18 stories CLT) topped out in just 10 weeks.
  10. G

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Line 7 needs to be scrapped at all costs
  11. G

    [Toronto] 1900 Dundas St W / 72 Sterling Rd.

    Really surprised more of these factory operations in older parts of Toronto haven't picked up and moved to Vaughn or Milton.
  12. G

    Alto - High Speed Rail (Toronto-Quebec City)

    Interesting that the language has changed from maximum speed of 300km/h to “speeds in excess of 300 kilometres an hour” I suspect the consortium is pushing for higher speeds than originally planned by the crown corporation. In my mind 350km/h would be “world class” HSR as of 2026. However, by...
  13. G

    2026 Ontario Liberal Leadership Race

    Hard disagree. At least on the housing front, Eric has a deeper understanding of the issues than anyone else rumoured to be running. On inexperience and naivety: see Zohran Mamdani or Justin Trudeau for that matter. Both of which aren’t policy wonks in the way Eric is.
  14. G

    Toronto East Harbour GO & Ontario Line Station | 14.35m | 1s | Metrolinx | HDR

    I believe the design contract for stations is split into South (Downtown), East Harbour, North, and Elevated. Each section will have its own treatment but is expected to follow the design concept work that was done by HDR. As far as I can tell, East Harbour will be the worst in terms of design...
  15. G

    Toronto East Harbour GO & Ontario Line Station | 14.35m | 1s | Metrolinx | HDR

    Slight improvement from the previous design iteration, still incredibly unserious. I think there is a pretty good chance the building that gets developed on the adjacent plot is tied directly into the station and becomes another entrance, in which case the prominence of this entrance will be...
  16. G

    Multiplexes

    My god that is a beautiful front facade. I would love to rent there.
  17. G

    TTC Ridership Growth Strategy 3

    Toronto Star continues to be an incredible joke of a publication. It is the peak of narcissism to conclude that commuting patterns in the GTA will have any sizeable effect on global warming. Our total emissions in Canada are less than the yearly increase in emissions from China alone.
  18. G

    Toronto 796 Glencairn | 13.3m | 4s | Toronto Standard | Bernard Watt

    Type of building that was constructed en masse across Canada in the 1970s. Heres hoping we see a new wave of small-scale rental apartments.
  19. G

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    As others have stated, opportunity cost is a real thing, and we can’t simply push the rewind button on the horribly designed Line 6, Line 5 surface section, or this Line 10. The capital that we have to expend on transit infrastructure is finite and the transit city obsession with light rail...
  20. G

    Sheppard Line 4 Subway Extension (Proposed)

    Could be faster, could be slower, my estimation mainly comes from how long it took YNSE to go from IBC to contracts awarded.

Back
Top