News   Nov 27, 2024
 807     4 
News   Nov 27, 2024
 688     1 
News   Nov 27, 2024
 1K     1 

Search results

  1. A

    miWay Transit

    Finally went through all of the changes. 5 Dixie: weekday peak from 12 to 14 minutes (EDIT h/t Toffy: -1 bus AM, +1 bus and runtime increase PM), peak periods shortened by ~3h in total early evening from 25 to 19 minutes (+2ish buses) 8 Cawthra: weekday midday from 33 to 36, Saturday from 48...
  2. A

    miWay Transit

    I haven't checked the other routes but the Dixie "improvement" is an outright lie. Currently it has 12 buses, 12-minute frequency at peak, after the changes it has 11 buses, 14-minute frequency. EDIT: this is correct for AM peak only, h/t Toffy
  3. A

    GO Transit: Service thread (including extensions)

    Doors on regional trains in Germany, Austria and Switzerland usually reopen with the slightest obstruction and cycle with no apparent limit (I've seen up to 8x). In practice after a few cycles the crew barks out an admonishment over the PA and people step back. Some long-distance equipment, such...
  4. A

    GO Transit: Service thread (including extensions)

    The person could have well been a tourist from a place where train doors are as forgiving as elevator doors and trains don't leave a minute before the published schedule.
  5. A

    GO Transit: Construction Projects (Metrolinx, various)

    I have to say I'm skeptical about the new track through Weston being very useful in the short term. Though it would make space for Kitchener trains to move off UPX tracks *at* Weston, it seems that together with the track layout and service pattern in other places, this would actually result in...
  6. A

    GO Transit: Service thread (including extensions)

    I wonder what the deal is with Georgetown. As far as I can tell, there's only about 0.35 mile of yard track, and the rest of the slowness is on bonded track built to mainline standards. Couldn't much of this be fixed just by tinkering with the signals? For example, letting westbound trains...
  7. A

    GO Transit: Construction Projects (Metrolinx, various)

    IIRC they'll be widening the platform to the south, to prepare for the new pocket track to be added as part of OnCorr.
  8. A

    GO Transit: Construction Projects (Metrolinx, various)

    I was hoping the new main track (old service track) through Malton would allow for a better PM eastbound schedule, without the 1.5 hour gap to let VIA 87 through. With the current layout at Wice, though, the new track (blue) can't be accessed from the east without reversing, and the...
  9. A

    VIA Rail

    The connection did work until recently, both from 70 to 84 and the other way. 70 was cancelled for the initial lockdown in March 2020 and wasn't restored until this September. Meanwhile, speeds on the Guelph sub dropped further. If I'm not mistaken, 84's last on-time arrival in Toronto was...
  10. A

    GO Transit: Service thread (including extensions)

    The westbound deadhead would leave Kitchener around 3am, not very rider-friendly. Eastbound, the deadhead has to contend with VIA 87. With the planned revenue arrival at 20:17, it can only head back east once 87 arrives around 21:50. Maybe 21:35 or so once Guelph is fixed. (If the westbound GO...
  11. A

    GO Transit: Service thread (including extensions)

    One thing that stood out to me in the videos of the test runs to London were the train numbers used, 3815 and 3824. In the current schedule, that would imply a Union departure at 11:04 and a Union arrival at 16:28, which in turn would mean a highly ambitious meet at Stratford around 13:45. Is...
  12. A

    GO Transit: Service thread (including extensions)

    The expresses would run between about 6:30 and 8:30 in the morning, 4 trains per hour, and between 3:30 and 6:30 in the afternoon with about 3 per hour. Union to Oakville took around 30 minutes. GO has rewritten its train schedules from scratch in the meantime, so the exact pre-covid departure...
  13. A

    Dundas St Rapid Transit (Metrolinx, Mississauga, Halton Region, CoT)

    Now if only they'd add a bus-only left turn phase westbound, so the 110 doesn't have to backtrack up the Collegeway!
  14. A

    GO Transit: Construction Projects (Metrolinx, various)

    Double track from Aurora up to Newmarket! I am pumped. And a paradoxical redo of Halwest, where despite adding a third track, GO would still be limited to one train through it at a time, without impacting CN?
  15. A

    GO Transit: Construction Projects (Metrolinx, various)

    Google Maps air photo from 2005 shows a service track branching off track 3 between the two crossovers to tracks 2, going through where the signal bungalow is now, with another right-hand crossover from track 3 east of those, east of which it followed today's track 4. The 2007 air photo shows...
  16. A

    GO Transit: Construction Projects (Metrolinx, various)

    Are they adding just one of these back or both?
  17. A

    Metrolinx: Other Items (catch all)

    As part of OnCorr the north service track at Burlington is supposed to be tied into the interlockings at either end of the station. I wonder if they're moving that up to allow for a more RER-like service design as soon as Confederation is ready.
  18. A

    GO Transit: Service thread (including extensions)

    Though the cuts are in some cases drastic (West Harbour having only a single train), for some trips the new schedules are actually an improvement. On the Lakeshore lines, all trips are local, giving inner stations three (LE) or four (LW) trains an hour, up from the usual two, and the long gaps...
  19. A

    GO Transit: Service thread (including extensions)

    Here's a list of added and removed through runs. From Dep Arr Union Dep old To old Dep new To new Lakeshore West Appleby 8:31 9:28 9:33 Oshawa Aldershot 13:01 14:11 14:13 Oshawa Oakville 14:11 14:56 15:10 Richmond Hill 14:58 Oshawa Kitchener...
  20. A

    GO Transit: Service thread (including extensions)

    Welp. These are the June seat-miles Verster was talking about: In less comical news, there's also two round trips extended from Aurora to Barrie on weekends, making good use of the Teston to Kirby double track.