News   Jul 12, 2024
 857     0 
News   Jul 12, 2024
 772     0 
News   Jul 12, 2024
 324     0 

Search results

  1. S

    VIA Rail

    The best option for VIA is to obtain access to the Mont-Royal tunnel. This is obviously what would be best for the HFR and for connection in downtown Montreal. I am not very optimistic anymore for that to ever happen. I was at first then realized that the infrastructures needed to efficiently...
  2. S

    VIA Rail

    La Presse mentions that the VIA-Siemens contract has an option for 16 additional trains if needs be.
  3. S

    VIA Rail

    I love the new design. I am glad they went with Siemens. I assume they will be able to reorganize their train sets to meet the demand on more popular routes. Either by coupling sets together or simply by adding cars.
  4. S

    VIA Rail

    I am sure this was mentioned before, but I have concerns about VIA ordering only 32 brand new train sets for 9100 passenger train sets and limited expansion capacity in a foreseeable future.
  5. S

    VIA Rail

    It is impossible to say based on this image that has been around for a while. VIA has made it clear they want to use the Mont-Royal Tunnel.
  6. S

    VIA Rail

    Must have been the unlimited rail pass.
  7. S

    VIA Rail

    CAD will be rebuilding something... hummm... I bet on the P42s
  8. S

    VIA Rail

    Some Châteaux and Park Cars were refurbished nicely to the Prestige Class and delivered back in 2014. Amazing work !
  9. S

    VIA Rail

    It seems that the HEP1 Coaches will be refurbished. http://montrealgazette.com/news/local-news/via-rail-awards-54-million-contract-to-bombardiers-plant-at-la-pocatiere
  10. S

    VIA Rail

    It seems that the work will be done by Bombardier in Lapocatière, Quebec.
  11. S

    VIA Rail

    I am writing this message while on The Canadian, we are currently about 14 hours late on our journey to Toronto. Most of the delay we experience is due to traffic between Jasper and Winnipeg. We had to wait for 14 freight trains to pass just before Melville, Saskatchewan, a pleasant 6 hours...
  12. S

    VIA Rail

    Also on the VIA Fleet renewall webpage http://www.viarail.ca/en/about-via-rail/fleet-renewal
  13. S

    VIA Rail

    http://nationalpost.com/news/politics/federal-budget-approves-new-fleet-of-trains-for-via-rail-but-dedicated-tracks-still-under-study
  14. S

    VIA Rail

    My best approximation would be until the viaduc at the corner of Wellington and Bridge.
  15. S

    VIA Rail

    I am tempted to say that the federal funding had to do with this decision. This is purely speculative. What is also interesting is that a specific entity/branch (a filiale, in French) named IntraMTL.co will be created and will own the Tunnel, the station and the rail viaduc from Gare Centrale to...
  16. S

    VIA Rail

    Interesting preliminary article from La Presse preceding a REM update scheduled for this AM. It seems that the Mont-Royal tunnel will be designed and renovated for the REM for an interoperability of the REM and HFR from Montreal to Quebec City...
  17. S

    VIA Rail

    I still believe the REM connection from A40 to Central Station will be much faster than the quite long detour around Mont-Royal. CDPQ advertises a travel time of < 10-15 minutes and the REM will directly bring people at the station. I was not a fan of the REM and how it would preclude VIA...
  18. S

    VIA Rail

    Has VIA ever ran corridor trains with 2 business class cars ?
  19. S

    VIA Rail

    Good news ! There will almost be hourly service from 9:30 am to 6:30 pm !
  20. S

    VIA Rail

    They should really build a stop in Laval at the current De La Concorde intermodal station served by the metro and the RTM (former AMT) St-Jerôme line. All the infrastructures are there already. This would allow for a quick connection for the metro network before having to transfer via the REM if...

Back
Top