News   Apr 20, 2026
 632     0 
News   Apr 20, 2026
 436     0 
News   Apr 20, 2026
 1.1K     3 

Recent content by M II A II R II K

  1. M II A II R II K

    Dundas St Rapid Transit (Metrolinx, Mississauga, Halton Region, CoT)

    Will the BRT corridor extend all the way to Kipling terminal, and if so would other busses be allowed to use its separated lanes east of 427.
  2. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    The drag factor of the surface section trickling into the tunnels no doubt.
  3. M II A II R II K

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    Too bad the east end of the Dundas West platform couldn’t have had a connection also.
  4. M II A II R II K

    Finch West Line 6 LRT

    Sydney’s new LRT was bemoaned for taking over 50 minutes when it started but now only takes over 30 minutes so there’s hope yet.
  5. M II A II R II K

    TTC: Other Items (catch all)

    The article didn't give a timeline as to when they will start being be rolled out.
  6. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    It's a low capacity subway with the drag factor of the onstreet section.
  7. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    They'll at least give updates every couple of months.
  8. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    So summer officially ended and there's no opening date.
  9. M II A II R II K

    Toronto Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    Surely the Halton museum would take at least one of them.
  10. M II A II R II K

    Toronto Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    https://www.cp24.com/news/toronto-transit-riders-group-to-hold-memorial-rally-on-wednesday-for-scarborough-rt-line-1.6530266
  11. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    https://www.blogto.com/city/2023/08/toronto-financial-woes-delay-eglinton-crosstown-lrt-ontario-line-opening/
  12. M II A II R II K

    TTC: Automatic Train Control and Subway Platform Screen Doors

    Line 1 station to get platform edge doors: https://twitter.com/i/web/status/1664386855050018817

Back
Top