News   Apr 17, 2026
 715     0 
News   Apr 17, 2026
 1.6K     6 
News   Apr 17, 2026
 681     0 

Search results

  1. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    The drag factor of the surface section trickling into the tunnels no doubt.
  2. M II A II R II K

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    Too bad the east end of the Dundas West platform couldn’t have had a connection also.
  3. M II A II R II K

    Finch West Line 6 LRT

    Sydney’s new LRT was bemoaned for taking over 50 minutes when it started but now only takes over 30 minutes so there’s hope yet.
  4. M II A II R II K

    TTC: Other Items (catch all)

    The article didn't give a timeline as to when they will start being be rolled out.
  5. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    It's a low capacity subway with the drag factor of the onstreet section.
  6. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    They'll at least give updates every couple of months.
  7. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    So summer officially ended and there's no opening date.
  8. M II A II R II K

    Toronto Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    Surely the Halton museum would take at least one of them.
  9. M II A II R II K

    Toronto Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    https://www.cp24.com/news/toronto-transit-riders-group-to-hold-memorial-rally-on-wednesday-for-scarborough-rt-line-1.6530266
  10. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    https://www.blogto.com/city/2023/08/toronto-financial-woes-delay-eglinton-crosstown-lrt-ontario-line-opening/
  11. M II A II R II K

    TTC: Automatic Train Control and Subway Platform Screen Doors

    Line 1 station to get platform edge doors: https://twitter.com/i/web/status/1664386855050018817
  12. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    I wonder if Line 5 will appear on the LED maps.
  13. M II A II R II K

    Toronto Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    If they are going to shut the RT down anyway they could have saved time and built the subway in the RT corridor's place.
  14. M II A II R II K

    Ontario Line Extension West of Ontario Place (Speculation)

    There would have to be a wait and see as to how the improved GO would work out in order to determine where best an extension could go.
  15. M II A II R II K

    Sheppard Line 4 Subway Extension (Proposed)

    This probably won't be a priority until at least the 2030s so we probably won't ride such extensions until about 2050.
  16. M II A II R II K

    Transit Fantasy Maps

    Once up on a time there was a loop extension to bypass Union and have Line 1 go down to Queens Quay.
  17. M II A II R II K

    Toronto Ontario Line 3 | Metrolinx

    So for the Queen Street closure that must be for mining out all the space underground necessary for the transfers there and stuff.

Back
Top