GenerationLee
Senior Member
Well, it's a start. At least Smart Track might mean something now beyond a hypothetical.
There are folks on site. Like 4 dudes, but..."folks"...Hopefully no news is good news and this is still moving forward?
King-Liberty has been removed from Metrolinx's 'What we're building' page for the Kitchener line [Link] and replaced with the Heritage Road Layover.
URL for King-Liberty is fully offline now. [Link]
Screenshots below of the pages as they were in March/April of this year.
View attachment 653004 View attachment 653005
All that is well ends well. So, umpteen amount was spent on the East Harbour with no great definitive ridership on the horizon, while a sure win for a perpetually transit-challenged area got dumped by the wayside. *slow clap*
AoD
And we're still going forward with the absolutely useless Bloor-Lansdowne "SmartTrack" station? Sigh.
The Finch-Agincourt Station would have been another really useful connection that's now without funding.
And we're still going forward with the absolutely useless Bloor-Lansdowne "SmartTrack" station? Sigh.
The Finch-Agincourt Station would have been another really useful connection that's now without funding.