When I saw maps like these dated March 2024 and earlier, I mistakenly assumed the line would be around 7 km. (I was mistaken, it was around 5.3 km as of 2024 afaik)
View attachment 701780
Instead this piece of sh** project has been descoped down to 3.8 km. At which point, why even bother.
Someone correct me if I'm wrong, this would be by far the shortest streetcar route in the city. By the time the city stops faffing
about, the window for comparatively cheap streetcar construction would be over, as that industrial area gets converted to
residential and commercial before a single shovel is in the ground for Waterfront East LRT.
And you already know the City was going to have this line run in mixed-traffic.
Might as well paint a couple of bus lanes and call it a day.
View attachment 701782
Source for descoping down to 3.8 km:
https://www.toronto.ca/legdocs/mmis/2025/ex/bgrd/backgroundfile-252828.pdf