I really don't get this. What de-risking is left?
So no investment in passenger rail because too many men are in the construction industry...Further update. Two more references to HFR:
View attachment 313733
Not sure why this says "396 million" and the text above says "491.2 million".
View attachment 313734
I really don't get this. What de-risking is left?
So no investment in passenger rail because too many men are in the construction industry...
more detailed design is my guess.I really don't get this. What de-risking is left?
Dealing with Metrolinx at Union Station? A bypass around Sharbot Lake? The Scarboro Junction situation? Old bridges in Peterborough? Could be several aspects.
I really don't get this. What de-risking is left?
I interpret from this that HFR won't start construction until 2026. In the very best case scenario, it means that HFR won't be finished until 2026, which isn't great either.Further update. Two more references to HFR:
View attachment 313733
Not sure why this says "396 million" and the text above says "491.2 million".
View attachment 313734
Derisking, or funding the contingency for the CIB I assume.I'm honestly confused. What parts of HFR can VIA do for $500 million? It can't build any substantial trackage, but it's too much for studies. If funding comes from the CIB, is this just a partial grant?