crs1026
Superstar
I'm not sure I follow. Why would we want an underpass? The CP line goes over the GO line, so I figure the westbound VIA track would be just high enough to clear the GO tracks (similar to the plans for Scarborough junction, except with an overpass ruther than an underpass). The remainder of the height difference to the CP tracks could be made up in the 400 metres between the GO line and Midland Ave.
If they can bend a line over the GO line and down, I'm all for it. I'm just a little cautious about what that location will permit. The tighter the curvature, the slower the speed. The GO line will have catenary, the VIA line may also, and the greater potential for squeal (at elevation, noise is deadly!). Can't say it's impossible, but the Pearson elevated line is a cautionary tale. We don't do elevated well around here.
So long as there's an underpass under CP, I wouldn't feel that a very short stretch of single track is fatal. A bit of double track on the VIA line immediately east of the connection would give a pocket track to hold a westbound VIA and allow an eastbound VIA to proceed unhindered, in the worst case where two opposing VIA's arrive at the same time.
Yeah, I have a nasty feeling that in order to cut costs for the inital HFR rollout, they would build a flat junction at Agincourt next to the current GO alignment, and lock that alignment in place with the ramp up to the CP line. And then there wouldn't be anywhere to build a grade separation in the future. As opposed to my drawing where the interim flat junction is realigned so as to leave space for a future westbound flyover. This is the fear I have about much of the HFR project: that they will omit all the future-proofing to cut costs for the initial rollout, thereby making it difficult to subsequently upgrade the route.
I share that same fear. It's no different than buying the cheapest computer that has the least amount of RAM or HD space....the cheapest of anything is seldom the most cost effective solution in the long term.
- Paul