News   Feb 06, 2026
 459     0 
News   Feb 06, 2026
 312     1 
News   Feb 05, 2026
 553     0 

TTC: Other Items (catch all)

All the TTC service changes for Sunday still aren't posted......

But i have most of it.........the format sucks so I'll just post one change for now.....because @PL1 would be interested. 51A/B will both run headway in the 24 m range.....but they are supposed to be inter-laced such that service from Donlands Stn to Eglinton should, in theory, improve to every 12' give or take.
That's definitely the one I need... Current 56 NB is 15 min service when I need it (there are a couple of extra runs for the high school crowd). Every 12 min is an improvement, though the forced transfer may eat into that
 
All the TTC service changes for Sunday still aren't posted......

But i have most of it.........the format sucks so I'll just post one change for now.....because @PL1 would be interested. 51A/B will both run headway in the 24 m range.....but they are supposed to be inter-laced such that service from Donlands Stn to Eglinton should, in theory, improve to every 12' give or take.
Reading from the only public source, the GTFS open data sucks as it's like reverse engineering the schedule. We can only resort to waiting for Steve Munro to blog about their internal memo as the TTC doesn't officially provide that info now in a easily accessible webpage. The service summary would be the best bet but that sometimes don't get published till weeks into the board period.
 
Reading from the only public source, the GTFS open data sucks as it's like reverse engineering the schedule. We can only resort to waiting for Steve Munro to blog about their internal memo as the TTC doesn't officially provide that info now in a easily accessible webpage. The service summary would be the best bet but that sometimes don't get published till weeks into the board period.

There are other sources......
 
Before the city reconstructed the Bloor/Dundas West and Kipling intersection. I heard TTC looked into adding a yard where the old abandoned movie theatre was. Didn’t the city said no to the TTC when they had other plans in place?
 
Before the city reconstructed the Bloor/Dundas West and Kipling intersection. I heard TTC looked into adding a yard where the old abandoned movie theatre was. Didn’t the city said no to the TTC when they had other plans in place?

There were several proposed projects on the old Westwood theatre site over the years. The current construction is probably the most rational use of that space (although I'm personally not thrilled with the design, but we shall see).

That was all before the old CPKC yard came on the market. Much better to have the subway yard tucked into an industrial area than on Bloor where mixed use/residential can be provided.

- Paul
 

Back
Top