I'm not opposed to some tweaks around fare gates and wayfinding; but I do hope this isn't all that significant an expenditure.
Ultimately, these busy stations need more vertical circulation capacity (stairs, escalators, elevators, entrances/exits) and where possible, larger mezzanines and more space for queuing in front of stairs/escalators etc.
These are expensive things to address. The Ontario Line should have positive impacts, but growth in population will eat into any benefit quite quickly.
St. Andrew, Osgoode, St. Patrick and Queen's Park would all benefit from an additional exit from the platform.
So would Dundas, though the latter also really needs an additional escalator between the SB mezzanine and the concourse level, and enlarged mezzanine space.
Right now only Bloor-Yonge and King are getting big expansion dollars, with St George in the offing in a few years.
A second exit is in planning/design for Dundas.
Suffice to say, I'd rather see more $$$ focused on critical solutions; but some time-buying is forgivable if the expenditure is modest and the payback tangible.
****
I'm going to add here, Sherbourne and Bathurst are among stations that will be facing capacity constraints in the years ahead, and they aren't even on the planning radar yet.