golodhendil
Active Member
Since the TTC is implementing ATC/ATO anyway, the cost for that should not be factored into a PSD project.The reason why I don't think there will be much of a cost saving - is that they will save slightly on material, cost of installation will likely be the same, a lot of the cost is related to automated control systems etc. Now, if we just fired the TTC drivers and imported a bunch of Japanese drivers - we would not have to have automation because they would likely stop the train right at the right point
I have seen TTC drivers miss by a full car, then half to back up
And many Japanese train systems have ATC/ATO, so I am not so sure they are necessarily that much better (I know that was a sarcastic statement, but yea).