micheal_can
Senior Member
Agree. Power outage. Homicide. Noxious substance. Flooding. All would take both Yonge Lines out of service.
Ay caramba
Actually, Spanish Solution makes sense on all interchange stations.
Agree. Power outage. Homicide. Noxious substance. Flooding. All would take both Yonge Lines out of service.
Ay caramba
So, you want to split line 1 into 2 different lines?
Do I need to tell you how flawed that is, or would you rather link me the forum and I help all of you learn?
Is it flawed though? Let's take one of your suggestions, an Avenue Rd subway, seriously for a moment. Under a decoupled Spadina Line, this frees the University Line to possibly backtrack into the Yonge Line at Davisville Stn. So southbound trains from Richmond Hill could either have the option to take the regular routing down Yonge... OR, via the existing third platform follow a new alignment via Avenue/side streets down to St George and then regular routing to Union via University. Northbound University Line trains could be served at Davisville via a new NB platform underneath the existing NB platform:
This loop effectively diverts traffic away from Bloor-Yonge and opens up new areas of downtown to subways. It's a winning proposition.
A few concerns I have are:There has been some discussion of this in the past, but given the City and Province moving ahead with an extension of the existing subway to Richmond Hill, it is critical that a real relief subway be constructed in the Yonge Street corridor. If not, the additional ridership from continual development, 905 riders, and the connection of the Eglinton Crosstown will make the current subway dysfunctional. It will also lead to dangerous overcrowding on the platforms.
As a tunnelling engineer, I looked at how we could build an express subway on Yonge street in parallel to the existing line. The answer is surprisingly simple. We select the work sites and new stations at locations were the existing subway is not within the Yonge Street right-of-way - at Lakeshore Blvd., at Mt. Pleasant Cemetery (south of Davisville), at York Mills Rd. and at Steeles Avenue. North of Steeles Avenue, the new subway would function as a local subway and connect with all the major streets - John, Hwy 7, 16th, Major Mac. etc.
My proposal does not connect to the Bloor-Danforth, Crosstown, or Sheppard subways because these connections would be very difficult and expensive to build and they are not necessary so long as there is reasonable connectivity between the old and new lines as there would be Downtown, at Mt. Pleasant Cemetery, and at York Mills Road. The tunnel lengths I am proposing of 5-6 km. are doable and because of the long drive lengths the cost will be less than the Crosstown.
The only real risk in the new subway construction is tunnelling directly under the live existing subway. South of Bloor St., the new tunnel would be deep and all in shale bedrock so the risk is minimal. North of Eglinton Ave. to Hoggs Hollow and again from south of Hwy 401 to Finch Ave., the new tunnel would be well below the existing subway structure ameliorating the risk. Careful mining techniques are required and modern tunnel boring machines are capable of dealing with varying geotechnical conditions that would be encountered. I have run the new tunnel profile from Lakeshore Blvd. to Steeles Ave. and the available tunnel window looks good.
I am now trying to get the TTC, the City, and the Province to look at this concept seriously. Below is an extract from my preliminary study. More detail on the website https://undergroundconsulting.ca/
I would appreciate some feedback.
Yonge Street Express Subway - Downtown Toronto to Richmond Hill
Preliminary Plan and Construction Feasibility
- Main Features
- 26 kilometres of all new subway line from Yonge St. at Lake Shore Blvd. to Major MacKenzie Dr. in Richmond Hill
- Twinning of the existing subway on Yonge St. will provide real congestion relief and redundancy for the existing line
- The latest operating technology can be used for the new Express line without being incumbered by existing outdated signaling and driver operation. It could be full subway or LRT style.
- All new tunnel construction is within existing right-of-ways – no property is required
- There is minimal impact on residents and businesses for such a major project
- Connections with the existing subway provided at Downtown, Davisville and York Mills Stations
- There is potential for an extension to Toronto Islands
Actually, I agree with you. I am just not sure how much those interchange stations would get used.Actually, Spanish Solution makes sense on all interchange stations.
We won't know till March.Has anyone the numbers on how the ridership coming from the west and north has changed with the Line 1 extension into Vaughan?
It would be so much easier just to extend the current line 1 platforms at busier stations to fit an extra car or 2.Is it flawed though? Let's take one of your suggestions, an Avenue Rd subway, seriously for a moment. Under a decoupled Spadina Line, this frees the University Line to possibly backtrack into the Yonge Line at Davisville Stn. So southbound trains from Richmond Hill could either have the option to take the regular routing down Yonge... OR, via the existing third platform follow a new alignment via Avenue/side streets down to St George and then regular routing to Union via University. Northbound University Line trains could be served at Davisville via a new NB platform underneath the existing NB platform:
This loop effectively diverts traffic away from Bloor-Yonge and opens up new areas of downtown to subways. It's a winning proposition.
Or simply use longer train on existing platforms. I doubt pocket tracks are designed so precisely that they can't accommodate a slightly longer trains with precision ATC.It would be so much easier just to extend the current line 1 platforms at busier stations to fit an extra car or 2.
Existing platforms can be lengthened. They don't have to be straight. St. Clair, Union, and Museum stations already have non-straight platforms (and those are the current platforms).Or simply use longer train on existing platforms. I doubt pocket tracks are designed so precisely that they can't accommodate a slightly longer trains with precision ATC.
North of Bloor, first car does not align with platform. South of Bloor, last car does not align with platform.
The problem with trying to use Bay Street is that it ends at Davenport Road and there is no easy route to connect back to Yonge Street. If you added a bunch of stations on Bay Street, it would be very expensive to build and then it wouldn't be be an express subway anymore.That's a very interesting concept, I never thought about this kind of solution before.
However, do you think it may be useful to route the downtown section of the new subway under Bay Street, rather than under Yonge and the existing subway? The Bay Street section would not need to be very deep, allowing multiple stations and thus a better access to destinations in downtown.
You have to break some eggs to make an omelette? Any large project should accept some degree of expropriation.The problem with trying to use Bay Street is that it ends at Davenport Road and there is no easy route to connect back to Yonge Street.
Agree with extra stations adding to costs - but I think stations close to everyones destination is a must.If you added a bunch of stations on Bay Street, it would be very expensive to build and then it wouldn't be be an express subway anymore.
You have to break some eggs to make an omelette? Any large project should accept some degree of expropriation.
How about trying the other side of Yonge - Church Street?
Agree with extra stations adding to costs - but I think stations close to everyones destination is a must.
There are two types of Express:
- Express through lower density areas (which this does through much of its lengths), and then regular stations where the density is (which this proposal omits).
- Express that stop at major stops and skips intermediate ones (something this proposal does not do since the major stops (King, Bloor, Eglinton, Sheppard) are not served due to complexity.
Nothing - but how urgent is it? I am not a fan of an express Yonge subway - I was just working with the proposal to see if it can be improved.
Here is an omelet breaking suggestion. It runs close enough to Yonge to be a real relief. It spaced decently to be express. It goes to Union and other downtown stations. It is building a new tunnel serving new riders
What would be bad about this line?
Nothing - but how urgent is it? I am not a fan of an express Yonge subway - I was just working with the proposal to see if it can be improved.
That said;
View attachment 223124
- The 1st steps in Yonge relief are an extension of the Ontario Line to Finch (Seneca), or even farther.
- Next improved frequency on the RH-GO line.
- Then its to create a network that doesn't force everyone to transfer at Y-B. This includes; Having Scarborough Rapid transit directly accessing downtown, instead of forcing it onto the B-D Line. Creating multiple transfers from B-D (and Eglinton) to downtown (not just Y-B and St. George). Possible interlining of YUS and B-D to reduce transfers.
- When all this is exhausted, a Bathurst Line can be considered (although I have thought of keeping Bay Street open for the Queens Quay East and West LRT's to come up into the core).
2050? Doug Ford can't think any further into future than June 2, 2022, the next election.