Toronto Yonge Eglinton Centre | ?m | 37s | RioCan | P + S / IBI

Up here at lunchtime yesterday, there were a few more people than seen in the photos. Very pleasant with the water running.

DSC01895.jpg

DSC01890.jpg


42
 
Are they going to finish the revitalization on the two towers?
The plans for that are so old now, unless there's a re-announcement, I would not expect any movement in the near future.

42
 
There's something new being looked at here.........and probably not small.

I'll tuck it in to the existing thread for now, and Mods can decide when to break it off.

From the Lobbyist Registry:

Details for Subject Matter Registration: SM32166​


Decision(s) or issue(s) to be lobbied

Residential & Mixed-use project 2300 Yonge Street, Suite 500, Toronto ON
 
Anyone know if they picked up the property to the west? 36 Eglinton?

Anything else on site means demolishing one or more of the core buildings; which I could see doing, but I think, similar to C-Square across the way, if you get to that point, you might want to optimize the entire footprint.

Hmmm.
 
Anyone know if they picked up the property to the west? 36 Eglinton?

Anything else on site means demolishing one or more of the core buildings; which I could see doing, but I think, similar to C-Square across the way, if you get to that point, you might want to optimize the entire footprint.

Hmmm.
36 Eglinton is Lifetime. I don't think it would be that. Likely just a repositioning of existing assets on site. Maybe the tower height additions are back?
 
36 Eglinton is Lifetime. I don't think it would be that. Likely just a repositioning of existing assets on site. Maybe the tower height additions are back?

Good thought.

Certainly less costly and risky than a large number of tear-downs.
 

Back
Top