Toronto YC Condos -- Yonge at College | 198.42m | 62s | Canderel | Graziani + Corazza

YC Construction Progress - March 23, 2018.jpg
Despite the clear blue sky & sunshine, I think the saddest part of this photo for me is how my view of One Bloor is slowly being covered up by YC Condos! Forever lost!
 

Attachments

  • YC Construction Progress - March 23, 2018.jpg
    YC Construction Progress - March 23, 2018.jpg
    829.4 KB · Views: 536
454-464 YONGE ST
Ward 27 - Tor & E.York District

►View All Properties


To alter the redevelopment plan approved under Site Specific By-law 1724-2013 for the construction of a 60-storey mixed use building by reducing the minimum required length and width of select parking spaces. A previous Committee of Adjustment decision (A0179/17TEY) permitted adding three residential dwelling units and reducing the amount of parking spaces.
Applications:
Type
Number Date Submitted Status
Minor Variance 18 124182 STE 27 MV Mar 2, 2018 Tentatively Scheduled
 
The top part of the building is shaping up to be pretty nice. But why did they have to create a poduim like this ! It looks too busy and cheap looking !
 
To add to the pile of legitimate complaints about this building, I don't think the balconies have enough visual "pop." The black and white graphic motif looks diluted. The railings should have been perforated metal, not glass.
 

Back
Top