This building is on structural caissons. There will not be any major foundation pits etc.. here. About 6-7 feet deeper to get to the bottom here. They are installing some more dewatering at the site to control the water.
 
Taken today:
IMG_1121.JPG
IMG_1122.JPG
 

Attachments

  • IMG_1121.JPG
    IMG_1121.JPG
    2 MB · Views: 3,249
  • IMG_1122.JPG
    IMG_1122.JPG
    1.9 MB · Views: 3,173
March 19
Looks like the end of the year or early 2017 before this hits grade. Couldn't get other shots due to the laneway close off.

Removing concrete for those large caissons in the centre of the pit.
25699561680_872c86b000_b.jpg

25371373553_6254967179_b.jpg

25974206106_0c9a9bf580_b.jpg

25699559860_773dfc0145_b.jpg
 
No doubt. Look at all that shoring. Plus they have been dewatering the site and drilled a fair amount of structural caissons from grade. These tight deep holes are a complicated.
 
There can't be a whole lot of space between the eastern wall and the subway. Given the way the building meets the street, the lower floor units may be some of the closest to the subway tracks along Yonge, and hence, the possibility of encountering noise issues.
 