300SRT8
Active Member
Hey everyone, long time no post
A lot of activity currently going on at 2 Gibbs
Here’s a picture of concrete being poured for the base of the crane on 09/12/18
The site got dumped on really badly from Monday’s storm, a lot of flooding
Pictures are taken from my unit in 9 Valhalla
A lot of activity currently going on at 2 Gibbs
Here’s a picture of concrete being poured for the base of the crane on 09/12/18
The site got dumped on really badly from Monday’s storm, a lot of flooding
Pictures are taken from my unit in 9 Valhalla
Attachments
Last edited by a moderator: