Toronto U of T: Schwartz Reisman Innovation Centre (Phase 1) | 64.8m | 13s | U of T | Weiss/Manfredi

Photos taken October 27th, 2022:

DSC00104.JPG


DSC00105.JPG


DSC00106.JPG


DSC00107.JPG


DSC00108.JPG


DSC00109.JPG


DSC00110.JPG


DSC00111.JPG


DSC00112.JPG


DSC00113.JPG
 
Once its big brother shows up immediately to the east, this'll go from from a 9 out of 10 to an 11.

42
 
That precast has a massive difference from the sunlit bright photos and the dull winter photos. Really looks outdated in the gloomy winter photos.
I noticed that too. The precast looks almost grimy on gloomy/dreary days.
 
That precast has a massive difference from the sunlit bright photos and the dull winter photos. Really looks outdated in the gloomy winter photos.
That's probably intentional. However, I would argue timeless as opposed to outdated though.
 

Back
Top