Toronto U of T: Schwartz Reisman Innovation Centre (Phase 1) | 64.8m | 13s | U of T | Weiss/Manfredi

Feb 28, 2020

fullsizeoutput_361a.jpeg




DSCN1972.JPG




DSCN1973.JPG








fullsizeoutput_3616.jpeg




DSCN1977.JPG




fullsizeoutput_3617.jpeg




fullsizeoutput_3618.jpeg
 

A note on the progress which is visible in Red Mars' photos - for those who may not be familiar with this stage of the construction. The material which is delivered to the site, being dumped by the truck with the yellow cab and red body, is back-fill to provide a stable and secure base on which the shoring equipment can be deployed. A fairly common requirement for construction in brownfield sites.
 

Back
Top