Looking at the above photos, I notice that the eastern elevator cores finished before the western cores, so it could be the way they are constructing this.Very strange that they are starting the exterior finishing of the east wing but the west wing hasn’t even had its structure erected yet. Is there a logistics issue with the timber supplier?