Project Essentials / dataBase – detailed project information, floor plans, renderings
Projects & Construction Thread
TYSSE: Finch West Station 
Finch Avenue West & Keele Street, Toronto
Developer: Toronto Transit Commission

TYSSE: Finch West Station | ?m | ?s | TTC | aLL Design | Page 9

Discussion in 'Buildings' started by W. K. Lis, Sep 27, 2009.

  1. salsa

    salsa Senior Member

    Joined:
    Sep 27, 2013
    Messages:
    7,571
    Likes Received:
    5,920
    Location:
    North York

  2. Edward Skira

    Edward Skira http://skyrisecities.com Staff Member

    Joined:
    Apr 22, 2007
    Messages:
    11,660
    Likes Received:
    5,847
    Location:
    Toronto
  3. junctionist

    junctionist Senior Member

    Joined:
    May 1, 2007
    Messages:
    8,011
    Likes Received:
    1,016
    It looks like a Montreal Metro station. We need more such design excellence in our transit stations.
     
  4. kotsy

    kotsy Senior Member

    Joined:
    Jan 30, 2012
    Messages:
    1,485
    Likes Received:
    1,981
    Location:
    East York
    LOVE the colour. Three thumbs up!
     
    ADRM likes this.
  5. PMT

    PMT Senior Member

    Joined:
    Jul 13, 2016
    Messages:
    1,627
    Likes Received:
    2,497
    Location:
    Turanna
    Taken today. Not much visible change on the bus terminal:
    DSC_0613.JPG

    Main entrance:
    DSC_0612.JPG

    DSC_0617.JPG

    DSC_0618.JPG

    Work has begun on the roadway in the bus terminal: DSC_0622.JPG

    DSC_0620.JPG

    The York University Busway between Keele Street and Tangiers Road was closed in June to make way for the commuter parking lot. Some progress has been made, but much of the space is still being used as a construction staging area:
    DSC_0629.JPG

    DSC_0627.JPG
    DSC_0630.JPG
    DSC_0628.JPG

    They are also preparing to shift traffic to the east side of Keele St to restore the west side:
    DSC_0632.JPG
     
  6. W. K. Lis

    W. K. Lis Superstar

    Joined:
    Dec 24, 2007
    Messages:
    12,484
    Likes Received:
    2,019
    Location:
    Toronto, ON, CAN, Terra, Sol, Milky Way
    Peeling that blue plastic off will take a day or two. (I kept the plastic on my new microwave's controls for three years.) Paving another week. Sod and landscaping another week.
     
  7. modernizt

    modernizt Senior Member

    Joined:
    Feb 8, 2014
    Messages:
    1,426
    Likes Received:
    893
    That blue material isn't going to be taken off - it's the AV barrier. Cladding will go over it.
     
    interchange42 likes this.
  8. W. K. Lis

    W. K. Lis Superstar

    Joined:
    Dec 24, 2007
    Messages:
    12,484
    Likes Received:
    2,019
    Location:
    Toronto, ON, CAN, Terra, Sol, Milky Way
    Should take a week or two then.
     
  9. lead82

    lead82 Senior Member

    Joined:
    Sep 18, 2007
    Messages:
    1,163
    Likes Received:
    270
    Location:
    North York Centre
    I can't believe how slow construction has been at this station. This was one of the simpler stations on the line and yet Bondfield really messed up. I hope they can finish it by December - less than 4 months to go.
     
  10. INTz

    INTz New Member

    Joined:
    Dec 20, 2015
    Messages:
    36
    Likes Received:
    31
    Posted in the TYSSE thread, this is probably better spot:

    They have finally started putting on what looks to be like cladding or some sub-cladding layer on Finch West station today. It is red coloured, but that might just be a protective layer that peels off. Sorry, no pictures yet.
     
  11. PMT

    PMT Senior Member

    Joined:
    Jul 13, 2016
    Messages:
    1,627
    Likes Received:
    2,497
    Location:
    Turanna
    Yesterday:
    upload_2017-10-8_9-38-17.

    upload_2017-10-8_9-38-36.

    upload_2017-10-8_9-38-57.

    upload_2017-10-8_9-39-18.

    upload_2017-10-8_9-39-31.

    upload_2017-10-8_9-39-49.

    upload_2017-10-8_9-40-4.
     
    interchange42 and AlbertC like this.
  12. Mic

    Mic New Member

    Joined:
    Sep 23, 2017
    Messages:
    4
    Likes Received:
    6
    Hmmm, before I had doubts that they would finish this by December. I think we have hope now.

    What do you guys think?
     
  13. AlbertC

    AlbertC Senior Member

    Joined:
    Apr 24, 2007
    Messages:
    3,642
    Likes Received:
    727
    Location:
    Burnistoun
    FYI, the Finch West Station's TCONNECT Wifi can now be accessed if you stand close enough from the outside.
     
    Molybdenum, PMT, Toronto1834 and 2 others like this.
  14. W. K. Lis

    W. K. Lis Superstar

    Joined:
    Dec 24, 2007
    Messages:
    12,484
    Likes Received:
    2,019
    Location:
    Toronto, ON, CAN, Terra, Sol, Milky Way
    At construction sites of new subdivisions, people move in while they continue to work on the outside, including landscaping. Same here, people will be going in and out as finishing construction continues around them.
     
  15. Contra

    Contra Active Member

    Joined:
    Jan 4, 2012
    Messages:
    559
    Likes Received:
    239
    Location:
    San Francisco
    Makes sense as to why we haven't seen much change in the facade over the past few months, they've likely been focusing on getting the overall infrastructure and roadways ready.
     