Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

evandyk

Senior Member
Member Bio
Joined
May 21, 2019
Messages
2,103
Reaction score
6,873
Location
St. Lawrence
Rabba probably has celery, though I've never looked. There is no way they have fennel, but they do specialize in rotten fruit. Make sure you look closely before buying!
 

DSC

Superstar
Member Bio
Joined
Jan 13, 2008
Messages
16,852
Reaction score
20,012
Location
St Lawrence Market Area
Has anyone recently looked at the south elevations (facing The Esplanade)? I believe they're repairing all of the metal panels.
One has to ask why the metal panels (the siding) should need to be repaired - the Building is not yet even complete. The standard of installation seems to have left much to be desired and this need for repair so soon after installation is not an encouraging sign. Are there other (less visible) defects elsewhere? I foresee many ongoing and expensive problems for the eventual Condo Board(s) and the Owners.
 

Star Fox

Active Member
Member Bio
Joined
Feb 7, 2018
Messages
235
Reaction score
519
What's the issue with them that required repair? Hadn't heard about this and can't find anything in the thread.
 

GTAConstruction

Active Member
Member Bio
Joined
Apr 25, 2019
Messages
101
Reaction score
220
One has to ask why the metal panels (the siding) should need to be repaired - the Building is not yet even complete. The standard of installation seems to have left much to be desired and this need for repair so soon after installation is not an encouraging sign. Are there other (less visible) defects elsewhere? I foresee many ongoing and expensive problems for the eventual Condo Board(s) and the Owners.
I believe the window and metal panel systems are in good working order and will not cause any problems for the condo or its owners in the future. The contractor is working on the building elevations to fix oil canning, gaps between panels, and other details, as far as I can tell.
 

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
26,759
Reaction score
33,827
Location
by the Humber
I believe the window and metal panel systems are in good working order and will not cause any problems for the condo or its owners in the future. The contractor is working on the building elevations to fix oil canning, gaps between panels, and other details, as far as I can tell.
Does that mean that they are replacing oil-canned panels with heavier gauge aluminum so that they don't oil-can? If so, good!

42
 

Johnny Au

Senior Member
Member Bio
Joined
Apr 4, 2010
Messages
8,686
Reaction score
16,238
Location
Near the North York, York, & Old Toronto tripoint
May 30, 2022:

IMG_4870.jpeg
IMG_4871.jpeg
IMG_4872.jpeg
IMG_4882.jpeg
IMG_4883.jpeg
IMG_4884.jpeg
 

Top