Toronto Theatre District Residence & Riu Plaza Hotel | 156.05m | 49s | Plaza | BDP Quadrangle

FF4963B7-5BF8-46DB-A2C6-5CEDAE49ACD3.jpeg
 
Around 2 years in total sounds about right. Based on the renderings, the first 2-3 levels form a shared podium which always takes longer to establish. So I'd reckon that portion itself to take at least a month or two. And then the first setback section on each tower which should start to streamline the processes a bit more. Many projects typically average around a floor or so per week in terms of concrete formation. Although, of course gotta factor in potential slow downs for the upcoming winter period.
 
How is this going to impact the East views of 87 Peter? Basically completely block East view for every floor to the top?
 
How is this going to impact the East views of 87 Peter? Basically completely block East view for every floor to the top?
How far apart are theses buildings from each other ? The Peter St building should of implemented all the elevator shafts and non important rooms on the east side of this building. Ha Ha ! !
 
How is this going to impact the East views of 87 Peter? Basically completely block East view for every floor to the top?
These buildings will be the east view from 87 Peter, every floor to the top.

42
 

Back
Top