Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

Mar 24, 2021

2EFCDCD2-8D88-44B9-A56F-5156081F0E7F_1_201_a.jpeg



826DB86A-F61A-4178-AD8A-EA3FB3A69587_1_201_a.jpeg



07B9B7E8-1914-48AE-95AF-8620A05CAC71_1_201_a.jpeg



E8D62E4C-B789-4CE8-8356-EE04CD7977E5_1_201_a.jpeg



CCF931E8-4918-4C46-A5A7-D151741882FD_1_201_a.jpeg



C1C1643F-1409-40CB-A9D5-1B3B0A54E0A9_1_201_a.jpeg



7D832250-6D84-4AC7-9971-0CD497829BA9_1_201_a.jpeg



D50C6E5F-C25E-4BF2-91BC-0454B4313103_1_201_a.jpeg



D4C8A17E-6C34-452D-9073-2D8569B81236_1_201_a.jpeg



651F81DF-8423-4018-A6B2-0DA9D78BC4EF_1_201_a.jpeg



8FD46736-CBB2-42D3-A542-A7CE1112F21D_1_201_a.jpeg
 
It looks like we should be seeing the same red cladding in a different format on the second floor extending along front, but I agree it would have been nice to carry the fins all the way around to Spadina. Right now I'm more curious about what is going on with the arched cladding. Plans called for terracotta but it looks like precast to me, and much flatter than depicted in the plans / renders. Maybe the plan is to overclad the precast with another material but its hard to tell right now.
 
Had a closer look through the leasing brocure and noticed this - looks like one of the tenants may be The National which is a food / drinks / event franchise based out of calgary


Screen Shot 2021-03-24 at 8.52.55 PM.png


Screen Shot 2021-03-24 at 8.53.57 PM.png
 
Definitely a range of quality in materials right now, will make for an interesting case study of materials combinations when it's all said and done. I imagine that there will be some beautiful angles, and some others not so much. Still lots more to come so let's hope it improves from here...
 
Looks like one more level to go for Building A and three more for Building B. These will probably be the first two to top out as the mechanical and restaurant levels for the office building seem to be taking longer than I was expecting.
 

Back
Top