Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

Pics taken Dec 7, 2018


pQahMy2.jpg



MQH4vhj.jpg



Eg6chhC.jpg




uIXPy1B.jpg




uAiR2lk.jpg



AbMdEGi.jpg



DHFYCTw.jpg
 
Concrete pump on the Office tower has jumped. Also, walking by along Spadina, it is going to be interesting how the street level and office tower level will meet as they seem pretty far off in height. Though I'm sure they know what they are doing haha.

20181211_132131_resized.jpg
 
An assembly of cranes, the birds that is, is sometimes called a construction of cranes, or a dance, or a swoop....

Could always go with a murder of cranes lol similar to a murder of crows. (What a group of crows is called if you did not already know). ;p
 
I see in the last picture posted that a concrete barrier has been added to the ramp going into the pit. Ironically I had just written a post saying a ramp such as this at a mine isn't allowed without a berm.
 
Last edited:

Back
Top