The Well | 174.03m | 46s | RioCan | Hariri Pontarini

Jasonzed

Senior Member
Member Bio
Joined
Jul 12, 2010
Messages
7,785
Reaction score
12,347
Location
Mississauga
IMG_20171210_1106426-panorama_zpsn0augo0v.jpg
 

coopEng

Active Member
Member Bio
Joined
Jan 13, 2016
Messages
124
Reaction score
185
Location
East York
On an interesting note, there are rumblings about a rough-in for a connection to the "future" Smarttrack Station south of Front. Probably one of the first projects where Smarttrack is being considered
 

AlvinofDiaspar

Moderator
Member Bio
Joined
Apr 22, 2007
Messages
30,824
Reaction score
22,793
Location
Toronto
On an interesting note, there are rumblings about a rough-in for a connection to the "future" Smarttrack Station south of Front. Probably one of the first projects where Smarttrack is being considered

Yes - from the SPA 16 269540 STE 20 SA Dec 21, 2016 - Architectural Plans dated October 5, 2017, Level P2:

upload_2017-12-18_8-25-23.png


Not only one, but two locations where there are knockout panels. You can see the same in the Smarttrack technical update report from the Nov City of Toronto Exec Committee:

upload_2017-12-18_8-28-48.png


https://www.toronto.ca/legdocs/mmis/2017/ex/bgrd/backgroundfile-109249.pdf

AoD
 

Attachments

  • upload_2017-12-18_8-25-23.png
    upload_2017-12-18_8-25-23.png
    299.3 KB · Views: 278
  • upload_2017-12-18_8-28-48.png
    upload_2017-12-18_8-28-48.png
    803.8 KB · Views: 290

innsertnamehere

Superstar
Member Bio
Joined
Mar 8, 2010
Messages
16,120
Reaction score
13,140
Metrolinx's offices are scattered around Union in several different buildings, but their main HQ with the big execs is in Union Station. Hard to find a better spot for it.
 

Top