Toronto The Twelve Hundred | 29.32m | 8s | Fieldgate | Arcadis

20230730_201616.jpg
20230730_201734.jpg
 
Precast brick installation has start on the lower levels. While not disastrous, it’s.. pretty bad. Much paler than the rich tone shown in the renders, and big XO1 vibes with the panel gaps. Pretty disappointing.
Sorry for the bad photos.
IMG_0207.jpeg
IMG_0208.jpeg
IMG_0210.jpeg
IMG_0213.jpeg
The curved southwest corner remains unclad, we’ll see how they do with that.
 
...it's usually Toronto The Grey and/or using bad colours with these developers. /sigh
 

Back
Top