Looks like we may get updated drawings soon in a re-submission: https://storeys.com/mizrahi-toronto-the-one-sales-process/
They're now targeting completion for the second half of 2027. Just embarrassing - a decade of construction for a building that's barely above 300m. Crosslinx could've completed this project faster. As noted in the article, I do hope they end up breaking up the upper floors into more units
View attachment 567986
Seems to be the case that a modified version of the 85 storey tower is what is being discussed here. The 91-storey was to include upwards of 600+ units (647 IIRC) as originally intended.
Quote from article:
Most significantly, however, is a "reconfiguration plan" the Receiver and senior secured creditors have now finalized for the upper levels of The One, above Level 61, which have yet to be constructed.
As originally designed, the upper levels would house only two or four units per floor, for a total of 69 units with an average size of 2,600 sq. ft. The reconfiguration plan will see 88 units added to the upper levels of the project by reconfiguring Levels 62 and 76 from a four-unit level to a six-unit level, Levels 63 to 75 from four-unit levels to 10-unit levels, and Levels 79 to 81 from two-unit levels to four-unit levels. This would increase the total amount of units from 415 to 503.