Basically (excuse any inaccuracies):

1601590728032.jpeg

(Photo by @AdamS)

AoD
 
I'm a little disappointed that they only extended 2 of those Kit Kat bar...I mean, super-columns, when I was expecting more would be added today. :(

Edit/Update: They didn't disappoint today (Friday) though. <3
 
Last edited:
After all column extensions are up they'll put formwork around the columns as well as a form 'table' for the atrium's ceiling, which will have to go pretty high.

Then I think they'll install the same massive flat steel connectors to bind the columns together like they had at grade before they poured concrete over it.
 
This timeline has a very 1,2 skip a few 99, 100 vibes to it with that brief hiatus.

View attachment 273625

Ah yes, I remember March 6. A little more hand washing and a little less hand shaking, but otherwise in the before times.

(I thought they were doing below-grade work then. Or was work stopped entirely? I remember it was for a time but forgot when.)
 