Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

Today.
A4645870-7916-479A-9D46-D3CAF85342B0.jpeg
2AF7D848-9F81-44A1-946A-8433163E78C7.jpeg
7145AAE1-CC66-4B95-A6AE-F2B6285CA405.jpeg
441AF461-879F-4785-8F98-8B23CF4592F9.jpeg
DBA2144E-3DF1-4B5F-A933-DADAC63EC8EE.jpeg
795414F2-B698-421C-A20B-709D1193D764.jpeg
56E81CCA-020E-44D4-A307-7AB3C104DFEC.jpeg
 
Forms for the walls are already being put up! Cautiously optimistic about the speed of progression now.

The rebar on the tic-tac-toe load-bearing walls still needs to be installed before the walls can be poured though.
Was thinking the same thing. Forms already feels like lightning speed. That's not something I say lightly, especially in relation to this development.
 
workers can even have a look at his tv if there is a Hockey game going on 😂
We actually had a similar thread of conversation a couple years ago!
@Benito your mission, should you choose to accept it. Is to make friends with the crane operator and other workers as the approach your floor!

And ultimately, we're hoping for pictures from your sky high barbeque! 🤣🤣
BBQ and Hockey viewing party at @Benito's place in a year! (I hope!!)
 
Wait until they have fully installed all the self-climbing formwork systems at the core and the perimeter.
Once this is in place they will be flying to the top of the structure. :)
And there will also be a huge surprise wrapping around the tower somewhen soon to protect the workers while glass installation and finishing jobs.
 
Do you want me to spoil the store which will open at ground floor or do you want to wait until they mount their Logo? ;)
If you read through the previous 700+ pages on this forum, I think that's been pretty well figured out (the store that must not be named even has it's own forum). Unless you're joking, then cheers!
 

Back
Top