It is for the best that Apple discussion continues here:
Apple Store
Apple products being better built is highly debatable. There are a lot of high quality options out there. "Highly debatable"? Their phones and computers keep topping top 10 and best lists and there's almost always a mention of "build quality" being one of the big reasons for that, but okay...urbantoronto.ca
I strongly agree with you that the construction of The One is to satisfy the needs of the Apple Store. By doing so, it makes the building that much better.As @AlvinofDiaspar correctly pointed out, we've spent the last year watching the construction of an intricate foundation and iron work whose sole purpose is to create a three story open retail space with no central pillars, to satisfy the requirements of its primary retail tenant. We're watching the construction of Toronto's first exoskeleton building solely because that primary retail tenant requires an open space at ground level. Sorry to break the news to you, but you're commenting on a thread about the construction of a Norman Foster designed Apple Store and the tower sitting on top of it.
This has nothing to do with Apple the consumer electronics company. This is about Apple the architecturally obsessed company with a thing for beautiful staircases and elevators, an obsession for stupidly expensive materials, a penchant for perfectionism in its finishes and a showoff attitude for innovative engineering in the buildings that represent the company to the world.
On any other thread, speculation of what comes next is common and encouraged. So, we will speculate on the arrival of the first piece of hand carved Castagna stone, to the delivery of the massive panes of glass, to the black hoarding going up, and in the final days on the parade of ficus trees going in.... just as we'll comment on the cladding and glass arriving on site for the tower portion. The podium of this building will dominate street life and determine how pedestrians experience The One when walking by. It's an integral part of the building and a primary driver of why it was engineered the way it was.
Now, let me get back to tracking Castagna Stone orders that should be on a ship on its way to Toronto from Italy as we speak since Apple takes possession of the space when the central crane comes out before Spring.
I strongly agree with you that the construction of The One is to satisfy the needs of the Apple Store. By doing so, it makes the building that much better.
I can't wait to see the Castagna Stone orders and I can't wait to marvel at the completed product with my very own eyes.
What I have posted earlier is to redirect discussion about Apple products.
Still pending I gather.So, about the height increase, I see the thread title has been changed. Are we that certain it will be approved? Does anyone know when the decision could be made?
I was able to extract the second render, without the foreground stuff:I finally found some views of the amenities (Taken from The One's official site). I didn't realize it's 9000 sq.ft of heated outdoor space, including the heated pool. That's major!
View attachment 299367View attachment 299368
I was able to extract the second render, without the foreground stuff:
View attachment 299369
images source
Not even close. The amenities floor is 30.35m high, so roughly the height of a 10-storey building. That apartment is 20 storeys tall. The top level is also not going to cantilever above the third floor as the outer walls of the podium extend all the way up to the roof terrace..I don't think the amenities floor is high enough to avoid the apartment slab to the south.
AoD
That rendering is from when in 2015 the south podium was planned to be 11 double-height floors tall, with the amenities up on the 12th floor deck. It was proposed to be taller than the UofT residential building to the south at that point. Should the rendering still be on the official website? Maybe not.Not even close. The amenities floor is 30.35m high, so roughly the height of a 10-storey building. That apartment is 20 storeys tall. The top level is also not going to cantilever above the third floor as the outer walls of the podium extend all the way up to the roof terrace..