Toronto The One | 308.6m | 85s | Tridel | Foster + Partners

Part 1 of 2 taken on December 10, 2023:

Bay and Cumberland:

IMG_1172.jpeg


Balmuto Side:

IMG_1174.jpeg


Back Alley:

IMG_1175.jpeg
IMG_1176.jpeg


Bloor Side:

IMG_1178.jpeg
IMG_1181.jpeg
IMG_1183.jpeg
IMG_1185.jpeg


IMG_1173.jpeg
IMG_1177.jpeg
IMG_1179.jpeg
IMG_1180.jpeg
IMG_1182.jpeg
IMG_1184.jpeg
 
It was snowing a bit when I took these pictures just now. There was very little activity at the top yesterday, most likely due to the wind. Great progress today. At the mechanical level below, it looks like they built a massive platform.

View attachment 527010View attachment 527011

I think they are reusable forms for doing the corners. They have been so far assembling such forms manually for each floor so this should speed up the buildup of the corner sections.
 