Toronto The James at Scrivener Square | 88.21m | 23s | Tricon | COBE Architects

IMG_8094.jpeg
IMG_8096.jpeg
 
I am elated they went for precast instead of metal panel on those vertical pickets and the slab edges. Really makes a big difference from the de facto aluminum.
 

Back
Top