The G&M Centre is going up very fast now, advancing about a floor every 8 to 10 days. Currently at the 7th floor at King Street, and 6th floor at Front Street. The building is now about a third of the way to the top (17 storeys + mechanical penthouse). At this pace, I anticipate the building will be topped off by early October.
Construction Photos taken June 26, 2015:
![](http://i1261.photobucket.com/albums/ii586/e17224/Globe%20and%20Mail%20Centre/IMG_4266_zps8tkr6mvw.jpg)
![](http://i1261.photobucket.com/albums/ii586/e17224/Globe%20and%20Mail%20Centre/IMG_4261_zpsytnl4nt8.jpg)
6th floor - Front Street section:
![](http://i1261.photobucket.com/albums/ii586/e17224/Globe%20and%20Mail%20Centre/IMG_4267_zpskjqclneu.jpg)
7th floor - King Street section:
Not a lot of privacy for the rooftop terrace of the owners of the heritage building. Mind you, I've never seen them ever use their terrace..
![](http://i1261.photobucket.com/albums/ii586/e17224/Globe%20and%20Mail%20Centre/IMG_4265_zpsouixo7of.jpg)
Scaled back city view:
![](http://i1261.photobucket.com/albums/ii586/e17224/Globe%20and%20Mail%20Centre/e2abac29-ecb8-45a8-9694-034ede94008b_zpskjcczrcl.jpg)
Construction Photos taken June 26, 2015:
![](http://i1261.photobucket.com/albums/ii586/e17224/Globe%20and%20Mail%20Centre/IMG_4266_zps8tkr6mvw.jpg)
![](http://i1261.photobucket.com/albums/ii586/e17224/Globe%20and%20Mail%20Centre/IMG_4261_zpsytnl4nt8.jpg)
6th floor - Front Street section:
![](http://i1261.photobucket.com/albums/ii586/e17224/Globe%20and%20Mail%20Centre/IMG_4267_zpskjqclneu.jpg)
7th floor - King Street section:
Not a lot of privacy for the rooftop terrace of the owners of the heritage building. Mind you, I've never seen them ever use their terrace..
![](http://i1261.photobucket.com/albums/ii586/e17224/Globe%20and%20Mail%20Centre/IMG_4265_zpsouixo7of.jpg)
Scaled back city view:
![](http://i1261.photobucket.com/albums/ii586/e17224/Globe%20and%20Mail%20Centre/e2abac29-ecb8-45a8-9694-034ede94008b_zpskjcczrcl.jpg)