I went by the site on the weekend. I didn't take any pics but the east side has the 1st floor poured and the west side looked a week or 2 away from being done. Assuming our non-winter holds my guess is they'll keep up with a 1 floor / month pace in the underground which would bring them back to st level june\july-ish.