Toronto Terrasse Condos at The Hunt Club | 25.91m | 7s | Sunrise Gate | RAW Design

Ww had our PDI, and honestly a little bit disappointed.

No sidewalks or clear entrance into the building

The lobby is not done, there isn’t even a door to the building

No flooring in the hallways yet

several of our purchased upgrades were just missing (light fixtures, counter tops, etc)

No fridge or washer/dryer unit

A gas meter in the coat closet? Like, isn’t that a hazard?

Loose wires leading from the wall into the bathroom sink

Also, none of the windows can be opened?? Like, there just is no way to open them.

There were no bathroom accessories (towel rack, toilet tissue holder) and were told the builder doesn’t plan on providing them, despite paper work we got when we bought the condo saying that they were included.

Our shared wall was hollow, not concrete, as we were told it would be.

This honestly feels like such a rush job, and that they did what they could to save costs and churn something out ASAP

@gary white when is your PDI date?
 
Ww had our PDI, and honestly a little bit disappointed.

No sidewalks or clear entrance into the building

The lobby is not done, there isn’t even a door to the building

No flooring in the hallways yet

several of our purchased upgrades were just missing (light fixtures, counter tops, etc)

No fridge or washer/dryer unit

A gas meter in the coat closet? Like, isn’t that a hazard?

Loose wires leading from the wall into the bathroom sink

Also, none of the windows can be opened?? Like, there just is no way to open them.

There were no bathroom accessories (towel rack, toilet tissue holder) and were told the builder doesn’t plan on providing them, despite paper work we got when we bought the condo saying that they were included.

Our shared wall was hollow, not concrete, as we were told it would be.

This honestly feels like such a rush job, and that they did what they could to save costs and churn something out ASAP

@gary white when is your PDI date?
You might want to sit down with a lawyer and your contract of sale.

42
 
If anyone is by here and can shoot this, looking north from across Kingston Road, that would be really handy for the year-end poll, thanks!

42
 

Back
Top