I believe work has started on the site.
20221206_133620.jpg
 
I wish that meeting were online — I am not able to attend to tomorrow evening. If anyone goes to the meeting, please relay what happened, give us some images to pore over!

42
 
Further to my post in the Park Lawn GO thread:
Construction equipment slowly appearing on site over the past couple of days. Can it be?

View attachment 519652View attachment 519653View attachment 519654

Grading work has started this morning. Given what they're doing, this thread is more appropriate for the update.

They're removing soil from behind the BMO at Park Lawn and Lake Shore:

PXL_20231113_142519257.jpg


PXL_20231113_142431587.jpg


PXL_20231113_141539336.jpg



They're then dumping and grading it near the site entrance along the Park Lawn further north, across the road from Key West:

PXL_20231113_141955814.jpg


PXL_20231113_142126276.jpg


PXL_20231113_142205472.jpg


Couldn't get a hold of any workers to find out what's happening here. Couldn't find any building applications on this either... 🤷
 

Attachments

  • PXL_20231113_141509901.jpg
    PXL_20231113_141509901.jpg
    322.8 KB · Views: 69
The tag team is back at it again today, joined by a compacting roller. Chipping away at the edge of the parking lot behind BMO.

PXL_20231114_154815477~2.jpg


PXL_20231114_154824597~2.jpg


PXL_20231114_153502196~2.jpg


PXL_20231114_153542716~2.jpg



Fresh survey stakes and paint markup on the ground.

PXL_20231114_153743975.jpg


PXL_20231114_153633860.jpg


PXL_20231114_153828018.jpg



Construction bollards stacked along Park Lawn near the rail crossing.

PXL_20231114_152926394~2.jpg


Most interestingly, survey stakes on the north side of the rail corridor. Right where I imagine Road A alignment would be.

PXL_20231114_152510022~2.jpg


PXL_20231114_152608994.jpg



Rough location of the stakes marked on the site plan with red dots:

Screenshot_20231114-114444.png



Now, I'm not saying anything, I'm just saying...
Coincidence?
 
The plot thickens... I saw this bad boy nonchalantly drive onto the site this morning:

1700150387183.png


1700150425978.png


1700150494380.png


1700150532349.png


1700150577177.png


Not 100% sure what this baby is, but it looks somewhat similar to the hydro-vac trucks I've seen before (water tank on wheels with a boom arm and a hose coming out of it):

Looks like they are roughing in the outine of the ditch for the 16 York to Maple Leaf Swuare connection with some sort of a water jet?
View attachment 171130View attachment 171131
Looks like a hydro-vac truck; they use this method to excavate near pipes, conduits etc.

It's doing something near Christie's water tower. Digging up old pipe connections? Preparing it for relocation?

Just as a reminder: the water tower is directly in the way of Road A construction.

1700149738957.png

1700149799575.png


While they haven't finalized the tower's final location (currently proposed to be in the station square), it is clear they need to remove it from its current location first. Is this what they are doing now? Time will tell.

The rest of the grading equipment is still hard at work, focusing on grading the same areas as in my previous posts. I will provide another photo on what they're doing in a few days. It looks like they are preparing a large rectangular level pad along Lake Shore Blvd right next to BMO. The pad dimensions are suspiciously water-tower-sized. Most likely another coincidence though.
 
Last edited:
The plot thickens... I saw this bad boy nonchalantly drive onto the site this morning:

View attachment 520629

View attachment 520630

View attachment 520631

View attachment 520632

View attachment 520633

Not 100% sure what this baby is, but it looks somewhat similar to the hydro-vac trucks I've seen before (water tank on wheels with a boom arm and a hose coming out of it):




It's doing something near Christie's water tower. Digging up old pipe connections? Preparing it for relocation?

Just as a reminder: the water tower is directly in the way of Road A construction.

View attachment 520626
View attachment 520627

While they haven't finalized the tower's final location (currently proposed to be in the station square), it is clear they need to remove it from its current location first. Is this what they are doing now? Time will tell.

The rest of the grading equipment is still hard at work, focusing on grading the same areas as in my previous posts. I will provide another photo on what they're doing in a few days. It looks like they are preparing a large rectangular level pad along Lake Shore Blvd right next to BMO. The pad dimensions are suspiciously water-tower-sized. Most likely another coincidence though.
It’s prepping earthworks for the condo sales centre location East of BMO, sales centre to be complete by summer 2024 I believe
 
Another update on the grading work happening on the site.

Last week the work was limited to the site of the future condo sales showroom as suggested above (area A) and the soil dumping ground near the site entrance along Park Lawn (area B). Nov 13:

1700603516496.png




Here's what the site looks like a week later, Nov 21:

1700603592867.png



The pad east of BMO has been expanded and leveled:

1700603785753.png



Most notable is that the work has expanded towards the water tower:

1700603894854.png



Note the heavy equipment tracks frequently traveled towards the water tower and some grading work done around it:

1700604060841.png



Same area a week ago (Nov 13), no tracks in the dirt, grass around the tower:

1700604174423.png
 

Attachments

  • 1700604025235.png
    1700604025235.png
    2.6 MB · Views: 71

Back