New Member
I believe work has started on the site.
As mentioned above this is just grading of the site for the upcoming Cirque de Soleil from March to June.I believe work has started on the site. View attachment 444270
Construction equipment slowly appearing on site over the past couple of days. Can it be?
View attachment 519652View attachment 519653View attachment 519654
Looks like they are roughing in the outine of the ditch for the 16 York to Maple Leaf Swuare connection with some sort of a water jet?
View attachment 171130View attachment 171131
Looks like a hydro-vac truck; they use this method to excavate near pipes, conduits etc.
It’s prepping earthworks for the condo sales centre location East of BMO, sales centre to be complete by summer 2024 I believeThe plot thickens... I saw this bad boy nonchalantly drive onto the site this morning:
View attachment 520629
View attachment 520630
View attachment 520631
View attachment 520632
View attachment 520633
Not 100% sure what this baby is, but it looks somewhat similar to the hydro-vac trucks I've seen before (water tank on wheels with a boom arm and a hose coming out of it):
It's doing something near Christie's water tower. Digging up old pipe connections? Preparing it for relocation?
Just as a reminder: the water tower is directly in the way of Road A construction.
View attachment 520626
View attachment 520627
While they haven't finalized the tower's final location (currently proposed to be in the station square), it is clear they need to remove it from its current location first. Is this what they are doing now? Time will tell.
The rest of the grading equipment is still hard at work, focusing on grading the same areas as in my previous posts. I will provide another photo on what they're doing in a few days. It looks like they are preparing a large rectangular level pad along Lake Shore Blvd right next to BMO. The pad dimensions are suspiciously water-tower-sized. Most likely another coincidence though.