Toronto St Lawrence Condos at 158 Front | 91.44m | 26s | Cityzen | a—A

Time and Space has sold very well. It'll get underway soon.

Time and Space is going to completely change this area, with it's 1600 units it is going to be an absolutely massive population boost.
 
Last edited by a moderator:
Actually, they cut down the few scrawny trees and removed the concrete planters that were their contribution to 'landscaping' but in essence "nothing". They had an application at C of A last week to reduce # of parking spaces - I assume it was accepted.
 
Saw some workers with hardhats onsite this morning. I was a block away so not sure what they were doing.

Removing utility poles.

IMG_9508.JPG
 

Attachments

  • IMG_9508.JPG
    IMG_9508.JPG
    256.4 KB · Views: 804

Attachments

  • 20171003_123705.jpg
    20171003_123705.jpg
    355.6 KB · Views: 565
  • 20171003_123555.jpg
    20171003_123555.jpg
    401.1 KB · Views: 568
  • 20171003_123523.jpg
    20171003_123523.jpg
    355.3 KB · Views: 556
The pics are much appreciated. It really looks like this is going to be a long process so updates are appreciated. Can't wait to get out of the suburbs
 
The pics are much appreciated. It really looks like this is going to be a long process so updates are appreciated. Can't wait to get out of the suburbs
I agree Philip. We are in the exact same situation and it is good to see things starting.
 
@philip yates
The pics are much appreciated. It really looks like this is going to be a long process so updates are appreciated. Can't wait to get out of the suburbs.

@Breeze I agree Philip. We are in the exact same situation and it is good to see things starting.

Though it is certainly good to see new residents keen to move into St Lawrence and this site has been an eyesore for far too long BUT it is probably going to be 3-4 years before you get here! The fact that this project has moved at such a glacial pace up to now is not a sign it will suddenly speed up.
 
Also this builder is known for their excessive delays. Just look at their two nearby projects, Backstage is still incomplete, and the LTower crane...
 
The showroom is now the construction office signage up.
7940D683-4BB6-4313-BAE9-D76C282357C4.jpeg
AADD4788-0A7C-4591-A922-83CCB1457935.jpeg
 

Attachments

  • 7940D683-4BB6-4313-BAE9-D76C282357C4.jpeg
    7940D683-4BB6-4313-BAE9-D76C282357C4.jpeg
    182.9 KB · Views: 682
  • AADD4788-0A7C-4591-A922-83CCB1457935.jpeg
    AADD4788-0A7C-4591-A922-83CCB1457935.jpeg
    200.4 KB · Views: 662

Back
Top