andomano
Active Member
Each station would then require a double crossover.
Each station would then require a double crossover.
I wonder when the station concept plans will be available for Finch West station (which has the LRT connection and a bus bay) and Vaughan Metropolitan Corporate Centre of Canada station (which will have VIVA connections and will possibly attempt to be urban).
They are probably taking a long time on the Vaughan station because of the complex design issues.
They are probably taking a long time on the Vaughan station because of the complex design issues.
Does anyone know if art is in the budget for the new Spadina line stations?
Aren't a couple of them already being built with them anyway?
Finch W, Steeles W, and VCC are being built with the double crosses, every other station, isn't that enough?.
So then why don't they build them in that order, and open them as they are completed?