micheal_can
Senior Member
Combine 1 with 77, 16 with 85, and 4 with 25 as starters since they are the main 3 east/west routes (Highway 7, 16th Ave/Rutherford, and Major Mackenzie Dr). At least the north/south routes are all pretty much connected in the southern portion.
YRT's coverage area is basically a grid. What should happen is there should be buses that simply run along the concession and side roads. Maybe expandingt he VIVA routes. Then they should have other buses that go into the various subdivisions within those grids. As those subdivisions get rebuilt into denser subdivisions, those bus routes could be changed to suit the needs.