Giving an visitor a tour of the new extension, Finch is going to be hard press to be ready for opening day. Lots of flashing on both building still need to be finish, concrete work missing in a lot of location from what I could see going north on Keele.
The old BRT road is gone connecting to Keele and being used to build a TTC parking lot. Grading was taking Place.
Keele Southbound lane not finish and will be December before traffic can use it.
Work was taking place on the roof of the 407 station.
The BRT station on hwy 7 will not be ready for December opening from my quick drive by.
The old BRT road is gone connecting to Keele and being used to build a TTC parking lot. Grading was taking Place.
Keele Southbound lane not finish and will be December before traffic can use it.
Work was taking place on the roof of the 407 station.
The BRT station on hwy 7 will not be ready for December opening from my quick drive by.