Ramako
Moderator
So a quetsion for you all ... when will we start seeing the tilt in the building, or can you already?
I thought it was gradual from the 20 or so story? Shouldn't we start seeing it already?
They're working on the 20th floor right now, which is the last hotel floor. The next two are sky lobby and lounge or something along those lines, then residences. It should start tilting very soon.