Here are some pictures from Friday & Saturday.
From the looks of it they are already about 10 feet down in some areas. After only 2 weeks of excavating this is moving extremely quickly.
Sorry for the poor contrast/quality. Shooting into the sun sucks.
So, are Ritz and RBC going to be two completely separate excavations, or are they going to dig one contiguous hole (once RBC excavates the west side of the site), and built up from the bottom?
The east side edge of the current excavation is being left as
a sloping grade presumably to be removed with the rest
of the RBC site when the loading docks are operational.