Toronto PRIME Condos | 148.43m | 46s | CentreCourt | Arcadis

Black trim almost complete up top.

IMG_4325.jpeg


IMG_4326.jpeg


IMG_4327.jpeg


(Just ignore Aura’s extra aura, a weird reflective artefact)…

IMG_4386.jpeg
 
Dec 15
Last shot this building up close was in May 2022 considering I bee shooting all around it as well from the distance.

More up on my site
53407456694_16a6608b32_b.jpg

53407131571_a301836ef5_b.jpg

53407131501_d0b0aa0b3c_b.jpg

53407456564_2bd9318bd1_b.jpg

53407456389_b97918aa94_b.jpg

53407309323_203f7493f0_b.jpg

53407456094_ae9c94a133_b.jpg
 
Estimated construction timeline:



  • Demolition: June 2021 to July 2021 
  • Excavation and shoring: from July 2021 to October 2021; 
  • Below grade formwork: from October 2021 to April 2022; 
  • Above grade formwork: from April 2022 to April 2023; 
  • Building envelope: from November 2022 to April 2024; and 
  • Interior finishes: from August 2023 to December 2024.

Happy 2024 UT!

They‘ve stuck to the timeline posted by @AlbertC (page ~11) pretty closely. That ‘envelope’ looks pretty clean (uncluttered design) in its completed form. Photos taken this morning.

0EBFE752-4FC4-4CC9-B2EE-A061A37D23EE.jpeg


25069F5B-5366-4493-98DC-4E0CE3686C40.jpeg


6F7435E6-60F4-41B7-8CED-87A824A91C4F.jpeg

331F2CBA-C5DA-47A1-B57D-F8DD578E4BF9.jpeg
 
So my wife and I spend our days staring out at Prime from our condo/office and have watched it go up over the last year +. Last night we noticed two red lights on the top of the building, but suddenly neither of us could decide if they were new or if they'd been there for awhile and we'd just never actually noticed them before. The number of lights-on in condo units have definitely been creeping steadily upwards over the last few months, but does anyone else know if the aviation lights are, in fact, new? (I assume that's what they are)
 

Back
Top