Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

Jun 30 2022
Forming for second floor in progress.

96A501A6-D6A3-48F2-9AFE-DE4A3F70D204.jpeg



F8580244-0B5E-402D-B5E0-4AF18DC1C6FD.jpeg



08B01283-60E3-4C1D-8054-4A94B9114761.jpeg



5C93255D-04DE-4165-AFF3-3300B16172F0.jpeg



B65D066A-E2AC-4EBD-9657-07F322C3C4CD_1_201_a.jpeg
 
How exciting! This stretch of Front is gonna be so cool with all the new developments and amenities/offices
 
Concrete pumping system being installed for the new Portland Commons building.

(A side note - when the initial consultation coordination conference call was held with area residents a couple of years ago, the question of whether a concrete pump system would be deployed due to the noise factor from operation of the pump, and Ellis-Don informed those on the call that there would not be a pump - all concrete would be via bucket lifts from the cranes. Presumably, as times change, the economics of different construction methods evolve, and plans are modified accordingly. The charitable interpretation...)

20220811_164812.jpg


20220812_111049.jpg
 